Name Assignees Milestone Hours Spent Project
New
#137 Build bedroom floor
User Tero
00:00 RV from bus
#136 Build garage walls
User Tero
00:00 RV from bus
#135 Weld garage sides and bedroom floor supports
User Tero
00:00 RV from bus
#134 Build new floor and wall on old fuel tank area
User Tero
00:00 RV from bus
#133 Dismantle old fuel tank area
User Tero
00:00 RV from bus
#132 Install new fuel tank
User Tero
00:00 RV from bus
#131 Remove old fuel tank
User Tero
00:00 RV from bus
#128 Build new garage floor
User Tero
00:00 RV from bus
#127 Weld new garage floor support structure
User Tero
00:00 RV from bus
#126 Weld new garage door support structure
User Tero
00:00 RV from bus
#125 Dismantle garage door support structure
User Tero
00:00 RV from bus
#111 Acquire Nabu Casa Home Assistant
User Tero
Install technical compartment 00:00 / 00:30 RV from bus
#109 Fix the generator installation and vibration bed
User Tero
Install technical compartment 00:00 / 04:00 RV from bus
#108 Sound proove and insulate generator boot
User Tero
Install technical compartment 00:00 / 08:00 RV from bus
#96 Acquire kitchen (Ikea)
User Tero
Building new interior 00:00 / 01:00 RV from bus
#93 Acquire sauna stove's water chimney
User Tero
Building Sauna 00:00 / 01:00 RV from bus
#91 Acquire sauna interior panels
User Tero
00:00 / 02:00 RV from bus
#90 Acquire sauna benches
User Tero
Building Sauna 00:00 / 02:00 RV from bus
#89 Acquire 30 mm Saunasatu for sauna ceiling & outer wall 7 square meters
User Tero
Building Sauna 00:00 / 01:00 RV from bus
#88 Acquire 50 mm Saunasatu for sauna walls 8 square meters
User Tero
Building Sauna 00:00 / 03:00 RV from bus
#87 Acquire steel structures for sauna & bathroom dry walls
User Tero
Building Sauna 00:00 / 03:00 RV from bus
#86 Acquire 6,5 mm plywood for sauna & bathroom walls 11 square meters
User Tero
Building Sauna 00:00 / 03:00 RV from bus
#85 Acquire 4 mm plywood for walls & ceiling 60 square meters
User Tero
Building new interior 00:00 / 04:00 RV from bus
#84 Acquire ceiling Armaflex AF 6 mm 20 square meters
User Tero
Building new interior 00:00 / 01:00 RV from bus
#82 Acquire dishwasher
User Tero
Build Kitchen 00:00 / 02:00 RV from bus
#81 Acquire gas stove (Ferre Style)
User Tero
Build Kitchen 00:00 / 01:00 RV from bus
#80 Acquire fridge/freezer (ikea Lagan)
User Tero
Build Kitchen 00:00 / 03:00 RV from bus
#79 Acquire mixers for kitchen, shower & toilet
User Tero
Building new interior 00:00 / 03:00 RV from bus
#78 Acquire shower tray with glass doors (Ikea OPPEJEN / FOTINGEN)
User Tero
Build toilet 00:00 / 03:00 RV from bus
#76 Inspect 230 V power
User Tero
Building new interior 00:00 / 01:00 RV from bus
#75 Install 230 V power
User Tero
Building new interior 00:00 / 16:00 RV from bus
#74 Inspect LNG installation
User Tero
Building new interior 00:00 / 01:00 RV from bus
#73 Install LNG lines
User Tero
Building new interior 00:00 / 08:00 RV from bus
#72 Install water chimney for sauna stove
User Tero
Building Sauna 00:00 / 08:00 RV from bus
#70 Build kitchen table
User Tero
Building new interior 00:00 / 08:00 RV from bus
#69 Build sofa
User Tero
Building new interior 00:00 / 24:00 RV from bus
#68 Install kitchen
User Tero
Building new interior 00:00 / 24:00 RV from bus
#67 Install plumming
User Tero
Building new interior 00:00 / 24:00 RV from bus
#66 Acquire and install 300 L IBC containers for fresh and septic water tanks
User Tero
Install technical compartment 00:00 / 16:00 RV from bus
#65 Install hybrid boiler
User Tero
Install technical compartment 00:00 / 24:00 RV from bus
#64 Build the walls and roof for the garage
User Tero
Build garage 00:00 / 24:00 RV from bus
#63 Install ramps and winch for garage
User Tero
Build garage 00:00 / 08:00 RV from bus
#62 Build garage and garage door
User Tero
Build garage 00:00 / 16:00 RV from bus
#61 Build Sauna dry walls
User Tero
Building Sauna 00:00 / 24:00 RV from bus
#60 Build toilet dry walls
User Tero
Build toilet 00:00 / 24:00 RV from bus
#59 Install ceiling plywood
User Tero
Building new interior 00:00 / 24:00 RV from bus
#58 Insulate ceiling with 6 mm Armaflex AF
User Tero
Building new interior 00:00 / 08:00 RV from bus
#57 Install wall plywood
User Tero
Building new interior 00:00 / 24:00 RV from bus
#56 Install floor
User Tero
Install floor 00:00 / 08:00 RV from bus
#55 Install floor and heating pipes
User Tero
Install floor 00:00 / 08:00 RV from bus
In development
#129 Design new fuel tank
User Tero
Install technical compartment 00:30 / 02:00 RV from bus
#130 Acquire new fuel tank
User Tero
Install technical compartment 00:30 / 02:00 RV from bus
#123 Garbage run
User Tero
Dismantling the interior 12:00 / 16:00 RV from bus
#52 Build new stairway for back door
User Tero
Building new interior 00:00 / 08:00 RV from bus
#120 Install Automatic Transfer Switch for shore power
User Tero
Install technical compartment 00:00 / 02:00 RV from bus
#71 Diesel tank for generator
User Tero
Install technical compartment 03:00 / 04:00 RV from bus
#77 Install interior lights (Philips Hue)
User Tero
Building new interior 02:00 / 08:00 RV from bus
#54 Insulate walls with 19 mm Armaflex GX
User Tero
Building new interior 06:00 / 08:00 RV from bus
#53 Insulate windows with 32 m Armaflex AF
User Tero
Building new interior 06:00 / 08:00 RV from bus
#103 Install Ring Alarm
User Tero
Building new interior 01:30 / 04:00 RV from bus
#51 Dismantle the garage door area
User Tero
Build garage 04:00 / 08:00 RV from bus
#110 Design and acquire hybrid boiler
User Tero
Install technical compartment 01:00 / 04:00 RV from bus
Done
#92 Acquire sauna stove
User Tero
Building Sauna 01:00 / 01:00 RV from bus
#124 Dismantle garage floor
User Tero
Dismantling the interior 02:30 / 04:00 RV from bus
#138 Aquire & Install 12 V water pump with tanks
User Tero
Install technical compartment 02:00 / 02:00 RV from bus
#122 Remove toilet's water tank
User Tero
Dismantling the interior 01:00 / 01:00 RV from bus
#121 Remove toilet water tank
User Tero
Dismantling the interior 01:00 / 01:00 RV from bus
#107 Aquire mobile wifi router
User Tero
Install technical compartment 02:00 / 02:00 RV from bus
#113 Install & configure Home Assistant on Raspberry Pi 3 B
User Tero
RV automation 04:00 / 04:00 RV from bus
#114 Integrate Ecoflow Delta Pro 3 with Home Assistant
User Tero
RV automation 02:30 / 04:00 RV from bus
#112 Aquire Shelly Pro 1
User Tero
Install technical compartment 01:00 / 01:00 RV from bus
#119 Aquire Box for Automatic Transfer Switch, fuses and Shelly Pro
User Tero
Install technical compartment 01:00 / 01:00 RV from bus
#118 Aquire Automatic Transfer Switch for shore power
User Tero
Install technical compartment 00:30 / 00:30 RV from bus
#117 Switchboard installation
User Tero
RV automation 04:00 / 04:00 RV from bus
#116 Electricity plan
User Tero
RV automation 04:00 / 04:00 RV from bus
#83 Aquire heatpump
User Tero
Install technical compartment 01:00 / 01:00 RV from bus
#102 Dismantle stairway
User Tero
Dismantling the interior 08:00 / 08:00 RV from bus
#50 Dismantle floor for the garage
User Tero
Build garage 08:00 / 08:00 RV from bus
#106 Aquire and install Ruuvi Tag to technocal boot
User Tero
Install technical compartment 01:00 / 01:00 RV from bus
#104 Aquire and install ventilation for generator boot
User Tero
Install technical compartment 03:00 / 03:00 RV from bus